Switch Made » Success Stories » Mall » City Center Sharjah – Sharjah, UAE
All this project was about renovating the mall (food court area) while it was running; challenging because the client wanted to achieve 400 lux with a 6m ceiling in a minimum average consumption. Our performant lighting solutions made the job!
Get notified about Switch Made new articles and success stories.